Born Pretty Nail Art Stamping Templates Set Flowers Leaves Plant French Stamping Image Plates Manicure DIY Design Stamp Plates 8PCS

Brand: Born Pretty Sold By: Everymarket
$43.55 In Stock
Ships from United States Arrives in 10-17 business days
Item can be returned in its original condition for a full refund or replacement within 30 days of receipt.
Delivery:
30
September2026
-
09
October2026
delivery Delivery Guarantee arrow
check$5 Credit If Delayed
checkFull Refund If Item Is Damaged
check15-Day Full Refund If No Updates
check30-Day Full Refund If Not Delivered
Born Pretty Nail Art Stamping Templates Set Flowers Leaves Plant French Stamping Image Plates Manicure DIY Design Stamp Plates 8PCS

Born Pretty Nail Art Stamping Templates Set Flo...

$43.55

Product Details
  • PACKAGE CONTENTS:8Pcs stamping plates,flower leaves patterns.
  • USAGE TIPS:The stamping plate should be cleaned in time after use. It is recommended to wash it with water-based nail polish remover. And after washing, the residual nail polish remover should be cleaned with alcohol to avoid rust.It is recommended to use a picker to clamp the cotton ball to clean the stamping plate, and you should avoid contact the nail polish remover directly and reduce the scratch on the surface of the stamping plate.
  • PATTERNS:Picture is showing our design in digital format .Every image on the plate are designed by BORN PRETTY Team.Awesome variety of well engraved images both small and full nail coverage.
  • IDEAL GIFT: BORN PRETTY stamping kit are appropriate for any holiday or special event,such as birthday, holiday, anniversary, Christmas, Valentine's Day, Halloween gift.
  • SERVICE GUARANTEE:BORN PRETTY strives to provide our customers with perfect products and service.If you have any questions about your order and package,please feel free to contact us.Expression and beauty by listening to, working with, and learning from our amazing customers.

  • Color: 8PCS French Stamping Plates
  • Model Number: NA
  • Package Quantity: 1
  • Part Number: 03870
  • Style: Nail,French,Flower

We are Born Pretty .The original inspiration of the name born pretty comes from proverb “each woman is born pretty”.
Combining the aim of providing beauty items to the female,we incorporated it into the name “born pretty”.
BORN PRETTY will meet all your nail needs.Only to make you satisfied.

Package Content:
8pcs Nail Art Stamp Template

Feature:
◎It make your nails look elegance and special.
◎Suitable for your party or fashionable look..
◎Great for both professional nail specialist or nail art learner.

Usage:
1. Apply base coat or regular polish on the nail.
2. Apply the nail polish to desired image within a plate. (Recommended: Use the Solid Color Nail Polish, so that the texture will be thicker than other nail polish).
3. Make a scraper leaned over 45 degrees and scrape excessive polish off quickly and strongly from inside to outside.
4. Immediately press the stamper with a gentle rolling motion to pick up the design. The image is transferred on the stamp.
5. Stamp the image on your nail with a gentle rolling motion. The image is transferred on your nail.
6. Repeat the above steps for all of your nails.
7. After nail art stamping, apply top coat for lasting wear.

We will try our best to serve you.
If you have any questions, the email sent to us, we will answer for you in 24 hours.

Shipping Summary:

We currently ship exclusively to addresses within the Canada.

Standard International Shipping from the United States to Canada costs CAD 14.99.

Shipping Time & Methods

Estimated Delivery Time: 10–15 business days
This total includes both processing and transit times.

  • Processing Time: All orders are processed and dispatched within 1–3 business days of purchase.

  • International Transit (US to Canada):
    Orders are initially shipped via FedEx from our U.S.-based fulfillment centers.
    Average international transit time is 4–8 business days.

  • Domestic Delivery within Canada:
    Once the shipment arrives in Canada, it is handed over to Canada Post or UPS for final delivery.
    Canada domestic delivery typically takes an additional 2–4 business days.

Shipping times may vary depending on the product’s fulfillment center and any customs processing that may be required.

Please note that while most packages arrive within the estimated timeframe, unexpected delays may occur due to factors such as customs inspections, public holidays, weather disruptions, or other unforeseen circumstances. Delivery dates are not guaranteed, as final transportation is managed by third-party carriers.


Tracking Information

You will receive a tracking number via email once your order has been dispatched.
Products may be shipped from different fulfillment centers depending on availability and inventory levels.


Delivery Information

Orders are delivered directly to most addresses within Canada, with the exception of P.O. boxes.

In certain remote or rural areas, additional delivery fees may apply. In such cases, you may be required to collect your parcel from the nearest shipping partner’s location.

Overview

We want you to be satisfied with your purchase. Please review our refund and return policy to understand how to proceed if you need to return an item or request a refund.


Order Cancellations

Canceling Your Order Before Shipping:
You can cancel your order within 2 hours of placing it. To do so:

  1. Log in to your account and cancel the order directly.

  2. Alternatively, email us immediately at cs@everymarket.ca with your order details.

If More Than 2 Hours Have Passed:
If it's been more than 2 hours since you placed your order, you will need to contact our customer service team for assistance. Please email us at cs@everymarket.ca with your order details.

Once Your Order Has Shipped:
Unfortunately, we cannot cancel orders once they’ve been shipped. In that case, you can return the item by following our return process.


Return Policy

Return Period: You have 30 days from the date of delivery to request a return.
Item Condition: Products must be unused, unwashed, and in their original packaging with all tags attached.
Return Shipping Costs: Customers are responsible for return shipping fees unless the item is defective.
Return Approval: Returns must be approved before sending items back. Contact us at cs@everymarket.ca to begin the process.


How to Initiate a Return

  1. Contact our support team at cs@everymarket.ca with your order number and reason for the return.

  2. If approved, we will provide a return shipping label and detailed instructions.

  3. Pack the item securely and send it back using a trackable shipping method.

  4. Once received and inspected, we will process your refund or exchange.


Defective or Damaged Products

If you receive a defective, damaged, or incorrect item, please contact us immediately.
Return Eligibility: Used defective items may be returned if the defect is confirmed.
Shipping Costs: We will cover the return shipping cost for defective or incorrect items.
Refund: A full refund, including original shipping costs, will be issued for defective items.


Returns for Customer Remorse (Changed Mind, Wrong Item Ordered)

Eligibility: Items may be returned within 30 days if they are unused and in their original condition.
Shipping Costs: Customers are responsible for return shipping fees.
Refund: Original shipping costs are non-refundable for remorse-based returns.


Items Not Eligible for Return

  • Electronic devices after 30 days (e.g., laptops, tablets, Kindles)

  • Gift cards and prepaid game cards

  • Perishable goods, some jewelry, and personal care items

  • Customized or personalized products

  • Items with special shipping restrictions


Refund Process

Processing Time: Refunds are issued within 3-5 business days after we receive and inspect the returned item.
Refund Method: Refunds are credited to the original payment method or as store credit for purchases made with gift cards.
Bank Processing: Please allow additional time for your bank to process the refund.


Exchanges

To exchange an item quickly, return the original product and place a new order for the replacement.


Return Address

EveryMarket Customer Service

Address: 46 Darnborough Way, City: Scarborough, Province: Ontario, Post code: M1W 2G1


Customer Support

Our support team is available 24/7 for any questions or assistance.
📧 Email: cs@everymarket.ca

  • PACKAGE CONTENTS:8Pcs stamping plates,flower leaves patterns.
  • USAGE TIPS:The stamping plate should be cleaned in time after use. It is recommended to wash it with water-based nail polish remover. And after washing, the residual nail polish remover should be cleaned with alcohol to avoid rust.It is recommended to use a picker to clamp the cotton ball to clean the stamping plate, and you should avoid contact the nail polish remover directly and reduce the scratch on the surface of the stamping plate.
  • PATTERNS:Picture is showing our design in digital format .Every image on the plate are designed by BORN PRETTY Team.Awesome variety of well engraved images both small and full nail coverage.
  • IDEAL GIFT: BORN PRETTY stamping kit are appropriate for any holiday or special event,such as birthday, holiday, anniversary, Christmas, Valentine's Day, Halloween gift.
  • SERVICE GUARANTEE:BORN PRETTY strives to provide our customers with perfect products and service.If you have any questions about your order and package,please feel free to contact us.Expression and beauty by listening to, working with, and learning from our amazing customers.

  • Color: 8PCS French Stamping Plates
  • Model Number: NA
  • Package Quantity: 1
  • Part Number: 03870
  • Style: Nail,French,Flower

We are Born Pretty .The original inspiration of the name born pretty comes from proverb “each woman is born pretty”.
Combining the aim of providing beauty items to the female,we incorporated it into the name “born pretty”.
BORN PRETTY will meet all your nail needs.Only to make you satisfied.

Package Content:
8pcs Nail Art Stamp Template

Feature:
◎It make your nails look elegance and special.
◎Suitable for your party or fashionable look..
◎Great for both professional nail specialist or nail art learner.

Usage:
1. Apply base coat or regular polish on the nail.
2. Apply the nail polish to desired image within a plate. (Recommended: Use the Solid Color Nail Polish, so that the texture will be thicker than other nail polish).
3. Make a scraper leaned over 45 degrees and scrape excessive polish off quickly and strongly from inside to outside.
4. Immediately press the stamper with a gentle rolling motion to pick up the design. The image is transferred on the stamp.
5. Stamp the image on your nail with a gentle rolling motion. The image is transferred on your nail.
6. Repeat the above steps for all of your nails.
7. After nail art stamping, apply top coat for lasting wear.

We will try our best to serve you.
If you have any questions, the email sent to us, we will answer for you in 24 hours.

Shipping Summary:

We currently ship exclusively to addresses within the Canada.

Standard International Shipping from the United States to Canada costs CAD 14.99.

Shipping Time & Methods

Estimated Delivery Time: 10–15 business days
This total includes both processing and transit times.

  • Processing Time: All orders are processed and dispatched within 1–3 business days of purchase.

  • International Transit (US to Canada):
    Orders are initially shipped via FedEx from our U.S.-based fulfillment centers.
    Average international transit time is 4–8 business days.

  • Domestic Delivery within Canada:
    Once the shipment arrives in Canada, it is handed over to Canada Post or UPS for final delivery.
    Canada domestic delivery typically takes an additional 2–4 business days.

Shipping times may vary depending on the product’s fulfillment center and any customs processing that may be required.

Please note that while most packages arrive within the estimated timeframe, unexpected delays may occur due to factors such as customs inspections, public holidays, weather disruptions, or other unforeseen circumstances. Delivery dates are not guaranteed, as final transportation is managed by third-party carriers.


Tracking Information

You will receive a tracking number via email once your order has been dispatched.
Products may be shipped from different fulfillment centers depending on availability and inventory levels.


Delivery Information

Orders are delivered directly to most addresses within Canada, with the exception of P.O. boxes.

In certain remote or rural areas, additional delivery fees may apply. In such cases, you may be required to collect your parcel from the nearest shipping partner’s location.

Overview

We want you to be satisfied with your purchase. Please review our refund and return policy to understand how to proceed if you need to return an item or request a refund.


Order Cancellations

Canceling Your Order Before Shipping:
You can cancel your order within 2 hours of placing it. To do so:

  1. Log in to your account and cancel the order directly.

  2. Alternatively, email us immediately at cs@everymarket.ca with your order details.

If More Than 2 Hours Have Passed:
If it's been more than 2 hours since you placed your order, you will need to contact our customer service team for assistance. Please email us at cs@everymarket.ca with your order details.

Once Your Order Has Shipped:
Unfortunately, we cannot cancel orders once they’ve been shipped. In that case, you can return the item by following our return process.


Return Policy

Return Period: You have 30 days from the date of delivery to request a return.
Item Condition: Products must be unused, unwashed, and in their original packaging with all tags attached.
Return Shipping Costs: Customers are responsible for return shipping fees unless the item is defective.
Return Approval: Returns must be approved before sending items back. Contact us at cs@everymarket.ca to begin the process.


How to Initiate a Return

  1. Contact our support team at cs@everymarket.ca with your order number and reason for the return.

  2. If approved, we will provide a return shipping label and detailed instructions.

  3. Pack the item securely and send it back using a trackable shipping method.

  4. Once received and inspected, we will process your refund or exchange.


Defective or Damaged Products

If you receive a defective, damaged, or incorrect item, please contact us immediately.
Return Eligibility: Used defective items may be returned if the defect is confirmed.
Shipping Costs: We will cover the return shipping cost for defective or incorrect items.
Refund: A full refund, including original shipping costs, will be issued for defective items.


Returns for Customer Remorse (Changed Mind, Wrong Item Ordered)

Eligibility: Items may be returned within 30 days if they are unused and in their original condition.
Shipping Costs: Customers are responsible for return shipping fees.
Refund: Original shipping costs are non-refundable for remorse-based returns.


Items Not Eligible for Return

  • Electronic devices after 30 days (e.g., laptops, tablets, Kindles)

  • Gift cards and prepaid game cards

  • Perishable goods, some jewelry, and personal care items

  • Customized or personalized products

  • Items with special shipping restrictions


Refund Process

Processing Time: Refunds are issued within 3-5 business days after we receive and inspect the returned item.
Refund Method: Refunds are credited to the original payment method or as store credit for purchases made with gift cards.
Bank Processing: Please allow additional time for your bank to process the refund.


Exchanges

To exchange an item quickly, return the original product and place a new order for the replacement.


Return Address

EveryMarket Customer Service

Address: 46 Darnborough Way, City: Scarborough, Province: Ontario, Post code: M1W 2G1


Customer Support

Our support team is available 24/7 for any questions or assistance.
📧 Email: cs@everymarket.ca

Oops!

Sorry, it looks like some products are not available in selected quantity.

OK